Did LA bike share take off? Ten years of answer
The question was reasonable in 2016. The system launched, grew to three areas, cancelled one of them, and is still running on a month-to-month contract.
Six lines carry most of the island's daily journeys. The interesting part is not the map; it is the unit the operators are held to.
Reviewed 2026-08-18 Authority: Land Transport Authority
The first stretch of the Mass Rapid Transit opened in November 1987, between Yio Chu Kang and Toa Payoh. The network now has six lines, and on a working day it carries the majority of the island’s public transport journeys.
These are different parties, which is the first thing to get straight when reading any statement about the network. The Land Transport Authority plans the network, builds it and owns the assets. Operation is licensed to operators who run the trains and staff the stations under a contract with performance standards attached. When a line underperforms, the question of who answers for it depends on whether the cause was an asset or its operation.
The North-South and East-West lines are the original network and the oldest infrastructure on it. The North East line, opened in 2003, was the first fully automated heavy rail line. The Circle line loops the city fringe rather than crossing it. The Downtown line runs a long diagonal through the centre. The Thomson-East Coast line is the newest, opening in stages from 2020 and adding a second north-south spine.
Light rail systems in several housing estates feed the heavy rail network. They are counted separately in reliability reporting, and their failures are reported against their own scale.
Rail reliability here is reported as mean distance between delays: how far the fleet travels, on average, between service delays that exceed a threshold. The threshold is five minutes.
Two things follow from that definition, and both are worth holding on to.
First, the measure is a distance, not a count. A year with more service kilometres and the same number of failures reports better. That is deliberate, because it makes a growing network comparable with a smaller one.
Second, delays below the threshold are outside the measure. A month of frequent short holds can coexist with a strong published figure, and passengers describing a line as unreliable are not necessarily contradicting the number. They are measuring something the number does not capture.
Running status for each line is published through an authenticated operator feed, not an open one. Rather than show a status this build cannot verify, the transport board leaves that column explicitly empty and reports what it can source: the network’s composition, and the vehicle quota figures beside it.
For current service information, the authority and the operators are the source of record.
Six on the Mass Rapid Transit network (North-South, East-West, North East, Circle, Downtown and Thomson-East Coast), with light rail systems feeding several housing estates on top of them.
Two operators run it under licence, not the authority that plans and owns it. Assets and planning sit with the Land Transport Authority; day-to-day operation is contracted.
For reliability reporting, a delay beyond five minutes. That threshold is the reason a service can feel unreliable in a month that reports well: a string of two-minute holds does not enter the measure.
The published measure is mean distance between delays: how far the fleet travels, on average, between failures beyond the threshold. Expressing it per kilometre rather than per incident makes years with different service volumes comparable.
Matched from the archive.
The question was reasonable in 2016. The system launched, grew to three areas, cancelled one of them, and is still running on a month-to-month contract.
A slogan competition is a symptom. A line that reaches the beach, gets a letter, then gets through-routed across downtown has an identity problem by design.
How do animals communicate, and how would you prove it? The test is not whether information moved. It is whether the receiver behaved differently.
Twenty-three horses learned to touch one of three symbols to say blanket on, blanket off, or no change. Then they used them according to the weather.
The central Arctic is contested water and almost nobody is in it. In 2014 two Norwegians parked a hovercraft on a floe and let it carry them 2,200 km.
A piano gives way mid-set and the pianist keeps going. It reads as a gag. It is closer to a trained reflex, and swing bands train for it.
Start here
COECertificate of Entitlement Topics HDBHousing & Development Board Topics MRTMass Rapid Transit Topics ERPElectronic Road Pricing Topics The dragon ants of New Guinea, and what X-rays found insideScience Stories The premium says little without the quotaTech Stories What a contagion model found in US mass-shooting dataWorld Stories The biggest dam in the world, explained: tallest vs largestTech Stories